Alex's Cables and Lace Kimono Wrap Cardigan
Right versus Left in a knitting (or crochet) pattern?

Crochet in a ch-2 sp?

Hello SweaterBabe!

I have been a very basic crocheter for years & really want to start learning to do more stitches, etc. I'm trying to crochet a baby blanket right now via a pattern & am stuck on a row.

Could you please translate/interpret this row a little better?? Row 6: Ch3, turn; dc in next 6 dc, 2 dc in next ch-2 sp, * dc in next dc, ch 2, skip next 2 dc, dc in next dc, 2 dc in next ch-2 sp; repeat from * across to last 7 dc, dc in last 7 dc: 92 dc and 19 ch-2 sps.

What I don't understand is the "2 dc in next ch-2 sp" part. I would appreciate your help! Thanks much!

-- Monique

Dear Monique,

Ch-2 sp means chain-2 space OR the space/hole created by a chain-2 from the previous row.

All you need to do when you get to that part is to insert your crochet hook into the hole (vs. the top of a stitch) and work your dc.  Because it is a dc, you will need to yo (yarn over) before you stick your hook in. 

Does that make sense?  It's actually the beauty of crochet that you can stick your hook into any hole and work your dc or crochet stitch. 

For example, a hole can be:

- a hole punched in leather

- a big ch-5 hole

- a ring created by a ch-4 joined with a slip stitch, which is how granny squares and all sorts of crochet "motifs" are started

- the holes (stitches) at the edge of a knitted piece

These holes are usually referred to in crochet patterns as "ch-# sp" or "ch-# arches".

Hope that explains it for you!

-- SweaterBabe

Comments

TONYA MC BRIDE

HELLO SWEATERBABE...I HAVE BEEN LOOKING ON THE INTERNET FOR HELP WITH THIS SWEATER PATTERN MARKED EASY FOR BEGINNER KNITTERS..GAUGE IS 18 STS AND 26 ROWS EQUALS 4 INCHES...I HAVE ALREADY STARTED SHAPING THE NECK AND MOVED STS TO A HOLDER...THEN FRONT: WORK AS FOR BACK UNTIL THE FRONT MEASURES 26 ROWS LESS THAN THE BACK....THE BACK MEASURE 23 AND A HALF..AFTER I KNIT THE FRONT THEN INSTRUCTIONS GO TO SHAPING THE NECK; MAINTAINING PATT, WORK ACROSS 30 STS; ATTACH 2ND BALL OF YARN, AND BIND OFF CENTER 21 STS, COMPLETE ROW...WORKING BOTH SIDES WITH SEPARATE BALLS OF YARN, CONT. IN PATT., DEC 1 ST AT EACH NECK EDGE(EVERY OTHER ROW) 3 TIMES. 27 STS ON EACH SHOULDER. WORK EVEN UNTIL FRONT MEASURES SAME AS BACK TO SHOULDER. BIND OFF FRONT AND BACK SHOULDERS USING 3 NEEDLE BIND-OFF...THANK YOU THIS IS MY FIRST SERIOUS SWEATER PROJECT...IT IS MARKED E A S Y.

Frances Wozniak

Please help. I bought #108 Girls ruffled top-down cardigan and forgot to down load the pdf file. I need m-1L and M1-R and single method cast-on-method.....

thank you

I always look forward to your patterns'

Frances wozniak

Beverley Naylor

Can anyone help?

I've just started knitting again and have come across the abbreviation pm. What does this mean?

Beverley Naylor

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been saved. Comments are moderated and will not appear until approved by the author. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Comments are moderated, and will not appear until the author has approved them.

Your Information

(Name and email address are required. Email address will not be displayed with the comment.)